Oil & Gas Projects |
NO | Project
Descriptions | Client | Description |
1 | Petronas
Refinery, Malacca | Petronas
Carigali S/B | Supplied
& Installed Explosion Proof Heat Tracing Panels |
2 | Petronas
Refinery, Malacca | Petronas
Carigali S/B | Supplied
& Installed 200 Nos of Explosion Proof Junction Boxes |
3 | Dulang
'B' Oil Rig, Kerteh | Petronas
Carigali S/B | Supplied
& Installed Explosion Proof Heat Tracing Panels |
4 | Dulang
'C' Oil Rig, Kerteh | Petronas
Carigali S/B | Supplied
& Installed Explosion Proof Starter Control Panels |
5 | Petronas
Twin Tower 2 | Zenith
Engineering & Trading | Supplied
& Installed Explosion Proof DOL Fuel Oil Control Panels. |
6 | Prai
LPG Bottling Plant, Prai | Petronas
Dagangan | Supplied
& Installed Explosion Proof Motor Control Center |
7 | Larut
'A' Topside Project, Pasir Gudang Johor | Petronas
Carigali S/B | Supplied
& Installed Explosion Proof Heat Tracing Panels |
8 | Bulk
Fuel Installation Project, Gong Kedak, Kelantan | JKR,
Kelantan | Supplied
& Installed Explosion Proof Junction Boxes |
9 | Tanjung
Langsat Port, Petrochemical Jetty | Tanjung
Langsat Port Sdn Bhd | Supplied
& Installed Explosion Proof Distribution Board, Db board, Isolator and Remote
Station | 10 | Hazardous
Liquid Cargo Jetty, Johor | Johor
Port Bhd | Supplied
& Installed Explosion Proof Enclosures |
11 | PHD
Plant Kuantan | MTBE
Malaysia | Supplied
& Installed 7 Heat Tracing Panels |
12 | CPSB-7
Heat Tracing Panel | Shell,
Brunei | Supplied
& Installed Heat Tracing Control Panels |
13 | Shell
Gas and Condensate Metering Project | Sarawak
Shell Berhad | Supplied
& Installed 4 Nos of Distribution Board | top
Sewage
Treatment Plant (STP) Projects |
NO | Plant
Location & Descriptions | Client | Project
Description | 1 | STP
for Putrajaya Wastewater Treatment Plant, KL | Putrajaya
Holdings Sdn Bhd | Supplied
and Installed 2 Units of Motor Control Centers |
2 | STP
for Hakuraahuraa Resort, Maldives India | Fantasea
World Investment Pvt Ltd | Supplied
and Installed Indoor Well Mounted Type Motor Starter Control Panel & Install
all Cabling Works | 3 | STP
for Perbangunan Bercampur Mukim Terbrau, Johor | Johor
Land Berhad | Supplied
and Installed Indoor Floor Standing Type Motor Controller Panel & Install
all Cabling Wroks | 4 | STP
for Curtin University of Technology Sarawak Campus | Bintulu
Ministry of Education | Supplied
and Installed Indoor Meter and Control Panel and install all Cabling Works |
5 | STP
for Kesuma Lake, Ulu Langat (Phase 2) | Agenda
Istimewa Development S/B | Supplied
and Installed Indoor Foor Standing Type Starter Control Panel & Install all
Cabling Works | 6 | STP
for Pembangunan Mukim Damansara, Selangor | Temasya
Development Co. S/B | Supplied
and Installed Indoor Type Control Panel & Install all Cabling Works |
7 | STP
for Perumahan Jalan Sungai Abong Mukim Muar, Johor Bahru | Tetuan
Dominon Park S/B | Supplied
and Installed Indoor Type Control Panel For Air Blower, Sludge Pump and Sewage
Pump and Install all Wiring & Cabling Work |
8 | STP
for Bandar Baru Teluk Intan, Perak | Bukit
Mewah Development S/B | Supplied
and Installed Indoor Flor Standing Motor Controller Panel & Install all Cabling
Work | 9 | STP
for UDA Project, Bayan Lepas, Penang | UDA
Holdings Sdn Bhd | Supplied
and Installed Indoor Type Control Panel for Sewage Pump and Air Blower & Install
all Cabling Work | 10 | STP
for Bandar Salak Tinggi, Sepang | Wembley
Rubber Products | Supplied
and Installed Indoor Wall Mounted Type Motor Control DOL and Air Blower Pump &
Install all Wiring & Cabling Work |
11 | STP
for Terrace House Mukim Kapar, Selangor | Sungai
Way Masalam S/B | Supplied
and Installed Indoor Control Panel for Air Blower and Sewage Pump & Install
all Cabling Work | top
Sewage Pumping Stations Projects
| NO | Plant
Location & Descriptions | Client | Project
Description | 1 | Pembangunan
Perdagangan Mukim Petaling Lestari Perdana | SAP
Holdings Bhd | Supplied
& Installed Oudtdoor Type 3 Pumping Station Control Panel and Install all
Wiring & Cabling Work | 2 | Putrajaya
Waste Water Development Project Phase 1B WW8 PS8 | Putrajaya
Holdings | Supplied
& Installed Pumping Station Control Panel and all Wiring & Cabling Work |
3 | Putrajaya
Waste Water Development Project Phase 1B WW8 PS15 | Putrajaya
Holdings | Supplied
& Installed Pumping Station Control Panel and all Wiring & Cabling Work |
4 | Curtin
University of Technology Sarawak Campus | Bintulu
Ministry of Education | Supplied
& Installed Pumping Station Control Panel and all Cabling Works |
5 | Sungai
Gadut, Mukim Rantau, Seremban | Suremax
Land S/B | Supplied
& Installed Pumping Station Control Panel and all Cabling Works |
top
Fire Panel Projects |
NO | Plant
Location & Descriptions | Client | Project
Description | 1 | Hazardous
Liquid Cargo Jetty, Johor | Johor
Port Bhd | Supplied
and Installed Diesel Engine Pump Control Panel Combine with Jockey Pump |
2 | Pembinaan
Unit Bengkel In Terminal No.3, Pulau Indah, West Port, Klang | West
Port Malaysia | Supplied
& Installed Fire Hydrant Pump Starter Control Panel |
3 | Pasir
Gudang, Johor | WaterField
S/B | Supplied
and Installed Diesel Engine Controller Panel and Jockey Pump Starter Panel |
4 | Port
Klang Lubricant Plant, Klang | WaterField
S/B | Supplied
& Installed Diesel Fire Water Pump Control | 5 | Klang
Valley Distribution Terminal, Petronas, Dengkil | Petronas | Supplied
, Test and Commissioned Fire Pump Controller Set |
6 | Coal
Stockyard Project, Manjung Ipoh | WaterField
S/B | To
Supply Fire Pump Control Panel | 7 | Labuan
Bulk Depot Project, Sabah | Petronas | Supplied
and Installed Hydrant Pump and Diesel Engine Control Panel |
8 | Oil
Waste Plant Kemaman, Terengganu | Hexagon
Tower S/B | Supplied
and Installed Hydrant Pump, Diesel, Star Delta Panel | top
|